Hillside Avenue

This summer the Township is overseeing the milling and paving of Hillside Ave. between West Hobart Gap Road and West Drive.

Montgomery Road

In Fall of 2013, the Township began the removal and placement of Belgian block curbing along sections of Montgomery Road. Milling and repaving followed curb and drainage improvements.

Orchard Lane

In Spring of 2014, the Township began curb improvements by along Orchard Lane from the intersection with Prospect Road. As well as milling and repaving followed curb and drainage improvements.

Tower Road

This summer the Township is repaving Tower Road. Work began with the replacement of damaged curbing.

West McClellan

In Spring of 2013, the Township began curb improvements to West McClellan in anticipation of upcoming paving. Barrier free ramps were installed at intersections in accordance with ADA standards.

Kredel Avenue

In Spring of 2013, the Township began reconstructing Kredel Avenue. Extensive drainage improvements and curbing were installed.

West Cedar Street

In April of 2013, the Township completed paving on West Cedar Street.

Mountain Ridge Booster Station

Beginning in 2012 and continuing into 2013, the Livingston Engineering Department oversaw construction of the Mountain Ridge Booster Station.